Or not.
The plumbing project has had its ups and downs. With the help of our awesome contractor/plumber/handyman Andy Davis, we’ve gotten the core plumbing runs connected. We now have modern (and more importantly, not-worth-stealing) PEX pipe runs from the basement to the first floor bathroom and kitchen. We cut off some unnecessary galvanized pipes in the basement, capped off what we don’t need for now, and generally got a grip on the cold system to the point where if we need to run some water during construction, we can do that (although the drain isn’t fixed yet: Waiting on power for that).