Re: Sullivan House: Renovation Log

In the fall, Soley replaced the water boiler / domestic hot water combo unit. It had developed a leak in the condenser which was determined to be a fault in the unit's design, since corrected. The upside is: free brand new boiler with a new 7-year warranty. Not a bad trade-off for having a little water on the basement floor! We also used the necessary draining of the system to replace a few radiator bleeder & control valves around the house.

LincLinc

Re: Sullivan House: Renovation Log

July 2016:

  • Porch roof was finished in cedar shake.
  • Final roof repairs, flashing, and cleanup.
  • Thus ends the 2-month roof replacement project.
LincLinc

Just over 4 years

and counting! Woohoo!

RyderRyder

Re: Sullivan House: Renovation Log

The rest of summer 2015 thru yesterday (Sunday):

  • Aaron milled new columns for the attic's north windows.
  • Rennaisance restored the north facade & rebuilt the north attic windows.
  • Andrea restored the office & turret windows.
  • Andrea restored the attic windows; only the south is reinstalled so far.
  • Radiators moved back into place.
  • Nicole painted the kitchen radiator.
  • Removed the back stairs radiator for painting.
  • Brian scraped clean the backstairs radiator & Nicole painted it.
  • Demolished broom closet in back stairs.
  • Aaron finished painting the trim on the carriage house peaks.
  • Aaron painted the second floor carriage house windows.
  • Painted carriage house door & window trim (first floor).
  • Continued painting carriage house doors.
  • Painted kitchen porch ceiling (coat 1).
  • Removed old hooks & boards in coat closet.
  • Patched screw holes in coat closet.
  • Removed a giant load of junk from the basement & attic.
  • Taped out cracks in the back stairwell first floor.
  • Spackled the back stairwell.
  • Mudded out the tape on the wall the radiator is on.
LincLinc

Re: Sullivan House: Renovation Log

The rest of May thru today:

  • Refinished the front stairs (start to finish).
  • Second & third coats on the back stairs.
  • Cleared the great room.
  • Hauled the radiators to the sandblasting shop.
  • Added a "frame" to the floor around the fireplace.
  • Gutters installed on the carriage house (minus 3 downspouts).
  • Andy & Danny installed the custom-milled trim where missing in kitchen & bathroom.
  • Andy & Danny patched and mudded in the coat closet.
LincLinc

Re: Sullivan House: Renovation Log

Last 2 weeks have been a bit slower with the house torn up for floor sanding. Fast & furious work will resume the 30th.

  • First floor hall, turret, office, pub, and backstairs were all sanded.
  • First coat poly on backstairs, turret & hall.
  • Two coats poly on office & pub.
  • Spring planting.
  • Aaron installed the irrigation system for the porch hanging baskets.
  • Cleaned out the alley.
  • Andy patched the inside of the coat closet.
  • Andy delivered our new kitchen thresholds which Randy installed.
  • New screen doors arrived.
  • Put a deposit on window restoration.
  • Put a deposit on final facade restoration.
LincLinc

Re: Sullivan House: Renovation Log