Linc
About
- Username
- Linc
- Joined
- Visits
- 1,038
- Last Active
- Roles
- Administrator
- Points
- 22
-
Re: Sullivan House: Renovation Log
April & May it was all about the carriage house and backyard: * Dave installed new light fixtures on first floor of carriage house * Dave wired the entire second floor of the carriage house (6 li… (View Post)2 -
Re: Sullivan House: Renovation Log
This winter we've been taking it nice and slow while weathering the severe cold and snow: - Top of the front stairwell ceiling was painted by Joe - Danny came and fixed the ceiling seam in the kitche… (View Post)1 -
Let the sunshine in
Let the sunshine in (View Post)1 -
Re: Sullivan House: Renovation Log
(Quote) Yes, but I decided July was my month off (from big stuff). After a year and a half of spending nearly all my free time on major projects, we needed some respite, especially after the big push… (View Post)1 -
Re: Sullivan House: Renovation Log
This weekend: Brian spliced the backyard lights where a squirrel chewed thru them Aaron did *all* the yardwork Lincoln prepped basement walls for painting & rustoleumed some shelves Lincoln demol… (View Post)3